Matrak AI Takeoff reads your drawings, measures every material and calculates its Scope 3 embodied carbon, line by line. On every project. On every revision. Automatically.
Often tens of thousands of dollars and months of consulting, done in about 30 minutes.
Drawings in, and every line comes back measured, with its carbon and the factor behind it. No model to build, no spreadsheet, no clicks.
PDFs, or connect Procore, Autodesk or Aconex once and every new revision comes through on its own. Add supplier EPDs if you have them.
Quantities, areas and runs, each marked on the drawing so anyone can check it.
Supplier EPDs first, NABERS factors for the rest. Every figure shows its factor and any assumption, so it can be checked or overridden.
Feed in the old and new drawing sets. Each is taken off separately and every change is flagged, so value engineering shows what it saves in dollars and what it costs in carbon, before it's built. Don't let a variation quietly knock you out of your Green Star target.
Rev C saved $420k but added 210 t, caught before it was built. Illustrative.
Climate disclosure now reaches into Scope 3. Matrak gives finance and sustainability teams project-level, material-level evidence for the regulator, the AGM and the annual report.
Material-level Scope 3 on every job and every revision, with the source of every factor.
Evidence for ASIC, the AGM and the annual report, without paying for the same study every year.
Carbon deltas on every variation, so value engineering never costs you the target.
Put your own EPDs into your takeoffs and show your carbon credentials from the very first quote.
Takeoffs for suppliers →Coverage of our carbon-tracking work with BlueScope, MECLA and China's building materials federation, and the talks behind it. Matrak has been a MECLA partner since 2022.
LCA and carbon platforms are excellent at the carbon maths, but someone still has to take off the quantities or build a model first. Matrak starts from the PDF drawings.
It starts from the actual materials and quantities on the drawings rather than from spend, and every line shows its quantity, its factor and any assumption (for example a wall thickness the drawing didn't give). A sustainability lead can check or override any figure, and supplier EPDs replace the NABERS defaults wherever you have them.
Upfront embodied carbon, cradle-to-gate (A1–A3), in kgCO2e for each line of the bill of quantities. It is the input to your Scope 3 and Green Star calculations, not a certified NABERS rating and not a whole-of-life LCA.
Your suppliers' Environmental Product Declarations (EPDs) when you attach them. Otherwise the NABERS National material emission factors database (v2026.2), the national dataset GBCA's Green Star Buildings requires for its Upfront Carbon credit.
Yes. Excel, CSV and the quote all carry the carbon columns, or push it straight into Matrak.
A$89 per takeoff, the same as any takeoff. Carbon is included. For a portfolio, book a call.
Drop in a drawing set. Carbon comes back on every line in about 30 minutes.